PROJECTS
New Zealand & abroad

Topdrill Geotech -9482 RT.jpg
Health and safety, checks out in Whakamarama

Health and safety, checks out in Whakamarama

Always time for a bit of rig maintenance before every job.

Always time for a bit of rig maintenance before every job.

Auckland bound.

Auckland bound.

40 meters of testing rods, ready to go deep

40 meters of testing rods, ready to go deep

Residential testing out at Te Puna. Our rig is small enough for some of the tightest spaces. - CPTu

Residential testing out at Te Puna. Our rig is small enough for some of the tightest spaces. - CPTu

Testing in Piacenza, Italy - Paolo, up from Rome and introducing our boss man to octopus pasta + the finer points of DPSH & SPT.

Testing in Piacenza, Italy - Paolo, up from Rome and introducing our boss man to octopus pasta + the finer points of DPSH & SPT.

A week of site tests in Piacenza, Italy - CPTu, SPT, DPSH.

A week of site tests in Piacenza, Italy - CPTu, SPT, DPSH.